1 中交特种工程有限公司摩洛哥卡萨布兰卡港磷酸盐码头修复项目经理部膨润土采购询价公告 - 采购与招标网权威发布
首页 > 招标信息 > 中交特种工程有限公司摩洛哥卡萨布兰卡港磷酸盐码头修复项目经理部膨润土采购询价公告
中交特种工程有限公司摩洛哥卡萨布兰卡港磷酸盐码头修复项目经理部膨润土采购询价公告
日期:2026-01-05 收藏项目
一、项目概况与询价内容一、Project Overview and Tendering ******** 项目概况:******** Project Overview:******** 项目名称:摩洛哥卡萨布兰卡港磷酸盐码头修复项目部 ******** Project Name: Restoration Project Department of Phosphate Terminal in Casablanca Port, ******** 项目地点:摩洛哥卡萨布兰卡港OPCP码头******** Project Location: OPCP Terminal, Port of Casablanca, ******** 项目简介:******** Project Overview:摩洛哥OCP磷酸盐码头位于摩洛哥大西洋沿岸中心的卡萨布兰卡港,63#、64#、65#和部分66#泊位始建于1928年,总长450m,港池底标高为********~********,码头面+********;19世纪50年代,对66#泊位延长了131m,港池底标高-12m,码头结构均为实心方块;1968年进行升级改造,原450m码头段,方块前后施打钢板桩,前沿线向外移1m,前板桩与方块之间填充胶结碎石,港池底标高加深至-10~-12m;扩建131m码头段,通过胸墙加宽使码头前沿线向外移动1m。Morocco OCP Phosphate Wharf is located in Casablanca Port in the center of Morocco's Atlantic Coast. 63# berth, 64# berth, 65# berth, and part of 66# berth were built in 1928, with a total length of 450m. The bottom elevation of the basin ranged from ********~********, while the quay wall was at +******** In the 1950s, 66# berth was extended by 131m. The bottom elevation of the basin reached -12m, and the wharf was of solid blocks. In 1968, upgrading and renovations were conducted. In the original 450m wharf section, steel sheet piles were driven in front of and behind the blocks, and the apron line was moved outward by 1m. Cemented crushed stones were filled between the front sheet piles and the blocks, and the bottom elevation of the basin was deepened to -10~-12m. The wharf section was expanded by 131m, and the wharf apron line was moved outward by 1m through widening of breast wall.由于海侧钢板桩腐蚀严重、上部结构及附属结构损坏严重以及港池回淤,业主计划对现有码头进行修复改造,修复码头岸线581m。Due to serious corrosion of seaside steel sheet piles, serious damage to superstructure and auxiliary structures, and siltation in the harbor basin, the Owner plans to repair and renovate the existing wharf. The aim is to rehabilitate the wharf shoreline with a length of 581m.项目分三个阶段实施,总工期为18个月。Phase0 为设计和施工准备阶段,3个月内完成;Phase1修复PM475-PM800,9个月内完成;Phase2修复PM800-PM1056,6个月内完成。The Project will be implemented in three phases, with a total construction period of 18 months. Phase 0 is the design and construction preparation stage, which will be completed within 3 months; Phase 1 is the stage for rehabilitating PM475-PM800, which will be completed within 9 months; Phase 2 the stage for rehabilitating PM800-PM1056, which will be completed within 6 ******** 询价内容:名称(Device name)规格型号( model)计量  单位(Unit)暂定数量(Quantity)交货时间(Delivery time)交货地点(Place of delivery)备注(Remarkers)膨润土(Bentonite) t********.01卡萨布兰卡  二、报价******** 表中综合单价为产品运到需方施工现场除材料费以外的价格,包含但不限于:运杂费、装车费、管理费、利润、服务费、财务费用、税金等一切费用。       ******** The comprehensive unit price in Table represents the price of the product when it is transported to the construction site of the buyer, excluding material costs, including but not limited to: transportation and miscellaneous charges, loading fees, management fees, profits, service fees, financial expenses, taxes, and all other ******** 运输费指把材料由生产所在地完好无损地运至询价方指定交货地点所发生的一切费用。******** Transportation costs refer to all expenses incurred for transporting materials intact from the production site to the designated delivery location by the inquiring ******** 本次招标数量为暂定数量,不作为最终结算依据。需方有权根据工程实际需求进行数量调整,且定价方式不变,最终结算数量以需方验收合格的数量为准。******** The quantity for this tender is a provisional one and will not be used as the basis for the final settlement. The buyer reserves the right to adjust the quantity based on the actual project requirements, and the pricing method remains unchanged. The final settlement quantity shall be subject to the quantity accepted as qualified by the ******** 产品需提供产品检验报告、出厂检验报告、送货单、合格证等资料。******** Products are required to provide product inspection reports, factory inspection reports, delivery notes, certificates of conformity and other relevant ******** 当国家发布政策调整增值税税率时,不含税单价保持不变,增值税税率按调整后税率执行,价税合计随之调整。******** When the state issues policies to adjust the value-added tax rate, the unit price excluding tax remains unchanged, and the value-added tax rate is implemented in accordance with the adjusted rate, with the total price and tax adjusted accordingly.

本招标项目仅供 正式会员查阅,您的权限不能浏览详细信息,请点击注册/登录,请联系工作人员办理入网升级。
联系人:王越
电话:010-68819835
手机:13661355191 (欢迎拨打手机/微信同号)
邮箱:wangyue@zbytb.com

请注册或升级为及以上会员,查看招投标方式
来源:项目来源
会员登录

商务vip 6800/年 更多优惠

客服电话:010-88938205

  • 发布公告:发布专线--135 2255 3979
  • 找回密码:找回专线--135 2255 6159
联系客服

客服电话:13661355191

招投标项目咨询:微信扫码,咨询王越